Distributor points, NOS, Marelli, long lead, 3 spring style

Distributor points, NOS, Marelli, long lead, 3 spring style - E0048X

Distributor points, NOS, Marelli, long lead, 3 spring... - E0048X


per set

Price: $45.60
Buy Product Online | Visit Store Home
   


 Other Items from Engine Compartment

  Throw-out bearing for a clutch, specify original style... - E0143X - Throw-out bearing for a clutch, specify original style with carbon face or modern version with hardened steel face, Teflon surface
  Brake reservoir, new manufacture, round plastic style with metal union at bottom - E0195XA - Brake reservoir, new manufacture, round plastic style with metal union at bottom
  Hood hinge bumper, stops hinge ... - E0249XC - Hood hinge bumper, stops hinge movement when hood is raised.
  Battery cable, positive, as original, 1.4 mt. long... - E0404 - Battery cable, positive, as original, 1.4 mt. long, correct Italian battery connection, specify with or without smaller red wire for alternator, for cars with engine mounted batteries.
  Battery cable, negative, as original, 250mm long... - E0405 - Battery cable, negative, as original, 250mm long, correct Italian battery connection, for cars with engine mounted batteries. Specify diameter of cable desired.
  Cotter Pin & Bracket for 9mm strapping  - Cotter Pin & Bracket for 9mm strapping
  Hose Clamp strapping 9 mm for fuel lline  - Hose Clamp strapping 9 mm for fuel lline (sold by the foot )
  Muffler hanger, large, stock, rubber about 1 thick\... - E0223X - Muffler hanger, large, stock, rubber about 1 thick\n
  Firewall grommet, heater hose. - E0239X - Firewall grommet, heater hose.
  Gasket for fuel injection pump, oil filter, fits all... - E0068XB - Gasket for fuel injection pump, oil filter, fits all Spica 4 cylinder pump body oil filter housings
  Wiring harness for GTA 1600 - E0495 - Wiring harness for GTA 1600

 

  Return To Re-Originals, Inc. - Restoration Headquarters

 

 

powered by MonsterCommerce shopping cart
E-commerce powered by MonsterCommerce shopping cart.